New Mexico GB-98 General Building Contractor Exam Exam Prep
Free practice questions

Free NM-GB98 Practice Questions

10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

The NM-GB98 exam has 50 questions and runs 8 hours 55 minutes.

These 10 free NM-GB98 questions are organized by exam domain, so you can see how each part of the New Mexico GB-98 General Building Contractor Exam blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: Part 1 - Sitework, Footings, and Foundations (9 questions)

Question 1

A residential footing subgrade must reach at least 95% of a specified Proctor maximum dry density. The laboratory maximum is 124 pcf, and a field test reports 116 pcf dry density. The lift looks firm and shows no rutting. What is the proper disposition?

Show answer & explanation

Correct answer: C - Correct and retest the lift; 116 divided by 124 is about 93.5%, below the 95% criterion

Question 2

A below-grade commercial wall will be exposed to hydrostatic pressure from a seasonal high water table. Which wall-protection approach is appropriate?

Show answer & explanation

Correct answer: C - Waterproofing, foundation drainage, and structural provisions for water pressure

Domain 2: Part 1 - Concrete and Concrete Reinforcement (9 questions)

Question 3

Finishers are preparing to power-trowel a slab while a sheen of bleed water remains on the surface. What should the superintendent direct?

Show answer & explanation

Correct answer: A - Wait until the bleed water is gone before final finishing

Question 4

A concrete mix has a specified compressive strength f'c of 4,000 psi. Three consecutive strength tests are 3,450, 4,400, and 4,400 psi. Under ACI 318 acceptance criteria, which conclusion is correct?

Show answer & explanation

Correct answer: B - The criteria fail because 3,450 psi is more than 500 psi below f'c

Domain 3: Part 1 - Masonry (6 questions)

Question 5

Water enters a newly built brick-veneer wall after wind-driven rain. The base flashing and weep openings are present, but mortar droppings form continuous bridges from the veneer to the sheathing. Which repair addresses the failure mechanism?

Show answer & explanation

Correct answer: D - Remove the mortar bridges and restore a clear cavity path so water reaches the flashing and weeps

Domain 4: Part 1 - Carpentry (12 questions)

Question 6

A New Mexico dwelling stair is detailed with a largest riser of 7-7/8 inches, a smallest tread of 9-1/4 inches, 1/4-inch maximum variation within the flight, and 36-1/2 inches of clear width. Which plan-review comment is supported by these dimensions?

Show answer & explanation

Correct answer: B - No correction; these dimensions meet New Mexico residential stair limits

Domain 5: Part 1 - Roofing (10 questions)

Question 7

On a 3:12 asphalt-shingle roof, the roofer proposes one underlayment layer and plans to place the underlayment beneath the drip edge at both eaves and rakes. Which revision is correct?

Show answer & explanation

Correct answer: B - Use two layers; place them over the eave drip edge and beneath the rake drip edge

Domain 6: Part 1 - Associated Trades (12 questions)

Question 8

A fixed pane beside a corridor has 8.5 square feet of exposed glass. Its bottom edge is 12 inches above the floor, its top edge is 50 inches above the floor, and the walking surface is 24 inches away. The pane is not in a door, stair, ramp, or wet-area location. How should the large-pane safety-glazing trigger be applied?

Show answer & explanation

Correct answer: D - Not under this trigger; the pane area is below 9 square feet

Domain 7: Part 1 - General Code, Plan Reading, and Estimating (14 questions)

Question 9

An architectural floor plan gives a framed opening as 8'-0", while the enlarged detail gives 7'-8". Both are written dimensions, and fabrication has not begun. What should the contractor do first?

Show answer & explanation

Correct answer: A - Submit an RFI and obtain written clarification before framing the affected opening

Domain 8: Part 1 - OSHA Safety (8 questions)

Question 10

A trench is 4 feet 6 inches deep. A competent person finds no indication of a cave-in hazard, but the only ladder is 40 feet laterally from the crew's work point. What correction is required before entry?

Show answer & explanation

Correct answer: C - Add or relocate a ladder so lateral travel is no more than 25 feet

The rest of the NM-GB98 blueprint

The NM-GB98 exam also covers these domains. Drill them in the full free practice test:

That's 10 of 1,030

The full bank has 1,020 more NM-GB98 questions with explanations.

Continue in the free practice test →

View plans